Torrent Power lines up Rs 7,200 crore green hydrogen foray

Torrent Power Ltd on Monday raised its bet on next-generation renewable energy (RE) by announcing entry in the green hydrogen (GH2) and ammonia production with an investment of Rs 7,200 crore in addition to projects worth Rs 57,000 crore on the table for attaining 10 gigawatts of RE capacity by 2030.

The Ahmedabad-based utility said GH2 and green ammonia project, aimed at catering to the domestic and export markets, is expected to generate about 1,000 direct and indirect employment on top of the 25,000 jobs seen from the investments in the RE capacity expansion. It is also pursuing a pumped storage power project capacity of 5-8 GW entailing investments of Rs 25,000 to Rs 35,000 crore.

Read more “Torrent Power lines up Rs 7,200 crore green hydrogen foray”

India’s First Semiconductor Fab Construction Begins in Gujarat

India’s first AI-enabled semiconductor fabrication plant has officially started construction in Dholera, Gujarat, marking a significant milestone for the nation’s semiconductor industry.

This Rs 910 billion project, led by Tata Electronics in collaboration with Taiwan’s Powerchip Semiconductor Manufacturing Corporation (PSMC), aims to make India a key player in the global semiconductor supply chain. Highlights • Location and investment: The fab will be situated in Dholera, a key industrial zone within the Delhi-Mumbai Industrial Corridor, with an investment of Rs 910 billion.

Read more “India’s First Semiconductor Fab Construction Begins in Gujarat”

Tata Electronics Signs MoU with Tokyo Electron to Purchase Semiconductor Equipment and Services

Tata Electronics has signed a memorandum of understanding (MoU) with Tokyo Electron Limited (TEL) to purchase semiconductor equipment and services.

This strategic partnership aims to accelerate the semiconductor equipment infrastructure for India’s first Fab being built by Tata Electronics in Dholera, Gujarat, and its assembly and test facility in Jagiroad, Assam.

The collaboration will focus on both front-end fabrication (creating semiconductor wafers) and back-end packaging (assembling and testing semiconductor chips).

Read more “Tata Electronics Signs MoU with Tokyo Electron to Purchase Semiconductor Equipment and Services”

CM: Dholera is top investment choice for semiconductor units

Delivering a keynote address on ‘0.Gujarat: An Industrial Powerhouse Driving Economic Growth‘ at the World Hindu Economic Forum in Mumbai on Sunday, chief minister Bhupendra Patel said that the state is dedicated to ensuring a green future with the renewable energy and green hydrogen policies. He added that the Dholera SIR (special investment region), with world-class infrastructure and logistics, has become a top investment choice for semiconductors and other emerging sectors.

Read more “CM: Dholera is top investment choice for semiconductor units”

Ahmedabad-Dholera Expressway To Boost Travel In 2025: Must-Know Information For Travelers

The Ahmedabad-Dholera Expressway is slated to open in early 2025, promising a major transformation in travel between Ahmedabad and Dholera. This new route will cut travel time to just 40-45 minutes, revolutionizing the journey. As a key segment of the Delhi-Mumbai Industrial Corridor, the expressway is poised to strengthen connectivity, spur economic growth, and promote sustainability, while bolstering infrastructure and facilitating industrial expansion in Gujarat.

Here are some key details travelers should be aware of:

Read more “Ahmedabad-Dholera Expressway To Boost Travel In 2025: Must-Know Information For Travelers”

Lam to open office at Tata Electronics’ Dholera chip fab

When Tata Electronics completes building India’s first semiconductor fabrication facility in Dholera, Gujarat, in partnership with Powerchip Semiconductor Manufacturing Corporation (PSMC), Lam Research India will set up an office there and support it, said a senior executive of the local arm of the US-based supplier of wafer fabrication equipment.

The facility will have a manufacturing capacity of up to 50,000 wafers per month. The Semiverse, Lam Research India’s virtual fab is actively used by all its customers and fabs around the world for simulation of their fab processes.

 

Lam Research India will set up an office in Gujarat to support this facility. The virtual fab by Lam Research, called Semiverse, will help reduce the cost and time of experimentation.

Read more “Lam to open office at Tata Electronics’ Dholera chip fab”

INOXAP joins forces with ReNew to power India’s first solar PV cell facility at Dholera

INOX Air Products (INOXAP) has started providing electronic and speciality gas supplies to ReNew’s first solar PV cell manufacturing facility in Dholera, Gujarat. Under a long-term agreement, INOXAP will supply essential gases like Nitrous Oxide, Ammonia, and Silane using a robust supply chain featuring state-of-the-art ISO containers and tube trailers. This ensures that ReNew has a steady supply that meets its operating and high-quality needs.

The partnership also incorporates a comprehensive gas management solution covering supply, distribution, and onsite handling, further supporting ReNew’s renewable energy goals. INOXAP’s ISO containers and specialised trailers meet stringent safety standards, reducing emissions while enhancing delivery efficiency. These reusable containers align with both companies’ sustainability goals, enabling eco-friendly PV cell production.

 

The partnership also incorporates gas management for supply, distribution, and onsite handling, advancing ReNew’s renewable goals.

Read more “INOXAP joins forces with ReNew to power India’s first solar PV cell facility at Dholera”

Ahmedabad-Dholera Expressway nears completion, expected to open by early 2025

Construction on the 109-kilometer Ahmedabad-Dholera Expressway is progressing rapidly, with around 80% of the work complete. The expressway, expected to open in early 2025, will reduce travel time between Ahmedabad and the Dholera Smart City to just 40–45 minutes.

The expressway will connect the Sardar Patel Ring Road in Ahmedabad with India’s first Greenfield Smart City. Many YouTube vloggers have visited the site to track its progress. Recently, RS Live shared updates on the construction phases.

 

Built at a cost of ₹4,373 crore, it will connect Ahmedabad’s Sardar Patel Ring Road with India’s first Greenfield Smart City in Dholera.

Read more “Ahmedabad-Dholera Expressway nears completion, expected to open by early 2025”

  • Deals in big & small land parcels inside DSIR.
  • Deals in Raw & NA (Non-Agricultural) lands.
  • Deals in Residential, Industrial, High Access, Knowledge & IT Sports & Resorts zone.
  • Deals in Own land parcels.
  • Specialised in NRI customers.
Information

Dholera, Ahmedabad

ngarg.consultant@gmail.com

Copyright © 2024 Dholera One. All Rights Reserved.

Login

Register

terms & conditions

Add to cart